Enertechnos is a pioneering clean-tech company dedicated to delivering decarbonisation.

Who We Are

Enertechnos was founded with a singular purpose: to provide a solution to help to deliver decarbonisation. 

Soon enough, it became clear that electricity is a key player when it comes to reducing carbon emissions.

What We Do

We invented – and patented – a concept called ‘Capacitive Transfer System’ (CTS).

CTS reduces power delivery loss and, more importantly, can deliver more power through the same conductor mass or operate at higher frequencies than conventional legacy cables.

Who we are

Enertechnos was founded with one vision in mind: to provide a solution to deliver decarbonisation. Soon enough, it became clear that whenever the question involves ‘decarbonisation’, the answer always involves ‘electricity’.

What we do

We invented and patented a concept called ‘Capacitive Transfer System’ (CTS), which reduces power delivery and, more importantly, can deliver more power through the same mass of conductor or operate at high frequencies than conventional legacy cables.

Our CTS cables can be easily manufactured in existing factories on standard cable-making machinery.

While developing the CTS concept, a large part of the engineering effort in recent years has been to adapt CTS to multiple applications while designing cables that can be made in any existing cable factories. Enertechnos’ strategy is not to be a manufacturer but to licence its technology to cable and hardware manufacturers worldwide.

Market Opportunity

In 2020, the market globally for cable and wire was circa $90 billion and projected overall grid investments to transition to net zero by 2050 was around $14 trillion. The breakdown of this $14 trillion was comprised of sustainment capital in replacing assets at end of life (48%), grid reinforcement (38%) and new connections (21%).

At the same time, there was a focus on providing EV charging infrastructure to convert billions of existing fossil fuel-driven vehicles to electric. This came in tandem with decarbonising the aviation sector and legacy fossil fuel producers.

Market Opportunity

In 2020 the market globally for cable and wire was circa $90 billion and projected overall grid investments to transition to net zero by 2050 is around $14 trillion where 48% of that value is sustainment capital in replacing assets at end of life, 38% is for grid reinforcement and 21% is for new connections. At the same time we have to provide EV charging infrastructure to convert billions of existing fossil fuel driven vehicles to electric, decarbonise aviation with several thousands of airports and even legacy fossil fuel producers.

Progress to Date

Enertechnos has used equity to fund research and development since its inception in 2014, reaching the following milestones:

2014
2015
Testing prototypes

Built our own cable-making machinery and the first CTS cable – flat (‘planar’) geometry

A highly successful testing programme proved the concept was valid as a linear cable

Designed a round (‘annular’) version of CTS, commissioned from a specialist cable company

2016
Design and validation

Tested 1km long annular cable under supervision by the National Physical Laboratory (NPL)

Designed the first enamelled CTS cable

Commissioned enamelled cable from a specialist cable company

Devised a high-frequency testing rig to emulate length

Established an Advisory Board of industry experts

2017
Forged relationships with DNOs

Commenced work with a leading UK distribution network operator

Continued testing of enamelled cable at high-frequency

2018
Produced cable

Moved into new premises to facilitate the growing team

Submitted new patents 

Awarded and started an Innovate UK project with Brunel University and TWI (The Welding Institute) as partners

Designed two version of the CTS cable

Ordered 1km of commercially-built ‘layered’ cable from a major Portuguese manufacturer

Started work on joints with Lovink Enertech in the Netherlands

Established Sheffield laboratory to test cable under Brunel University supervision

Ordered enamelled cable from a major Italian manufacturer

2019
Regulatory

Concluded Sheffield tests with both layered and enamelled cable versions

Completed Innovate UK programme with the award for ‘Best Environmental’ project

Joined Ofgem Environment Working Group

Commenced BEIS-funded Energy Entrepreneurs Fund, Round 7 (EEF7) programme with two phases:

Phase 1: material testing at very high voltage

Phase 2: use of CTS in wireless car charging applications

Built high-voltage test lab (up to 70kV)

2020
Materials testing and grid compliance design

Continued EEF7 programme

Drafted design guidelines for CTS installations in grid networks

Designed cable protection system

Designed a CTS grid modelling methodology using DigSilent software package

2021
Created underground cable prototypes

Completed EEF7 project

Finalised joint design for underground cable with working prototypes

2022
Launch of new business sectors

Launched a new business direction in electric vehicle (EV) charging

Launched a new business direction in aviation

Won and received funding for the NZTC Open Innovation Programme

Want to get in touch?

We’re proud to be at the forefront of the clean tech industry and always looking for opportunities for our technology to be used across countries and industries.

Feel free to get in touch by clicking the link below.

Want to get in Touch?

We’re proud to be at the forefront of the clean tech industry and are always looking for application opportunities for our technology.

Get in touch by clicking the link below.